Major Projects executed

Over the past 15 years, we have completed a number of high profile projects for customers across the Middle East and Asia. Each of these turnkey solutions have been engineered to account for exact customer requirements and designed to comply with local legislation where appropriate.

Major turnkey projects implemented for the power industry

Some of the projects we have completed include:

  • Design, engineering and installation of a Fire Protection System for Oman Aluminium Rolling Mill Plant
  • FDA for the blast furnace located at the IISCO Steel Plant
  • A VSP 1069H inert gas suppressant system for Air Liquide
  • A Fire Fighting System (FFS) implementation in LBSS-1 and LBSS-4 A/C for the Salem Steel plant
  • A complete FFS solution for IISCO at the Burpur Power Blowing Station
  • A PKG 23A centralised compressed air hydrant system for Bluestar
  • A VSP 71FDA solution for Cosmic Power
  • A FFS solution designed to protect the coal-and-coke processes at the Burnpur power station
  • A CCM-1,2,3 of VSPI solution for M&P
  • Fire protective systems for the CPP & IPP coal handling plant at Jharsigudah

We draw upon a number of technologies to create the perfect fire protection system.