Regardless of whether the power plant is fuelled by nuclear, coal, gas or oil, we can identify, install and maintain the correct safety system for the site in question.
We offer a broad range of systems to cover various forms of fire:
Hydrant systems Full site protection for the entire plant.
HVWS protection protects transformers, lube oil units and boiler burners.
MVWS protection extends fire safety coverage to conveyors, cable gallery and storage tanks.
Inert gas systems use Inergen or Sapphire to extinguish control room, switch gear room and server room fires.
Foam systems prevent the spread of fire from fuel oil tanks.
FDA for manual call plants, extending to the entire power plant.
Portable extinguishers offer manual fire fighting protection for the site.
CO2 extinguishing systems in both high and low-pressure variants to offer protection for gas or steam turbine enclosures.
Sprinkler systems for emergency DG equipment and diesel-powered fire pumps.
Passive fire protection protects cables and cable coatings, adding resilience to internal systems.
Gas detection systems identify potential problems before a fire can start.
Fire Alarm Systems to cover the entire plant advising employees of fire-related emergencies.
S. No. | CUSTOMER NAME | PROJECT NAME | ||
---|---|---|---|---|
1 | CUSTOMER NAME | THDC Limited | PROJECT NAME | SITC of FDPS for 2X660 MW TPP at Khurja, UP |
2 | CUSTOMER NAME | Hindalco Industries Ltd., Mumbai | PROJECT NAME | SITC of FPS for Hindalco's 6x150 MW CCPP at Mahan |
3 | CUSTOMER NAME | Hindalco Industries Ltd., Mumbai | PROJECT NAME | SITC of FPS for Aditya Aluminium's 6x150 MW CCPP at Lapanga |
4 | CUSTOMER NAME | Adani Ltd., Kawai | PROJECT NAME | SITC of FPS for Adani's 2X660 MW TPP at Kawai |
5 | CUSTOMER NAME | NCC Power Projects Ltd., Hyderabad | PROJECT NAME | SITC of FPS for NCCPPL's 2X660 MW PP at Ananthapuram, Nellore |
6 | CUSTOMER NAME | Andhra Pradesh Power Development Company Ltd | PROJECT NAME | SITC of FPS for APPDCL's 1X800 MW SDS TPP Stage-II at Krishnapatnam |
7 | CUSTOMER NAME | HPGCL, Haryana | PROJECT NAME | SITC of FPS for 2 X 600 MW Hisar TPP, Hisar - Haryana |
8 | CUSTOMER NAME | Jaypee Group | PROJECT NAME | SITC of FPS for Jaypee's 2X660 MW STPP at Nigiri |
9 | CUSTOMER NAME | Lanco Amarkantak Power (P) Ltd., Hyderabad | PROJECT NAME | SITC of FPS for 2 X 300 MW Lanco Amarkantak TPP at Korba, Chhattisgarh |
10 | CUSTOMER NAME | Reliance Energy Ltd., Mumbai | PROJECT NAME | SITC of FPS for 2 X 300 MW Rosa TPP (Stage I) at Shajahanpur, U.P. |